Compressor exchange with no Ex zone
Example task: Exchange the semi-hermetic compressor operated with A2L refrigerant R454C. The compressor is located on a rack in a machine room. The room has some ventilation. There is no leak from the system.
Special tools or preconditions:
- Mobile A2L gas detector
- A2L leak detector
- A2L fire extinguisher
- A2L recovery equipment
- Vacuum pump with external switch, outside room
- Extra fan
- A2L anti-sparking tool – not necessary
- Avoid Ex zone! Avoid / check for leakage!
Working steps or preconditions:
- Educated worker
- Read / inform for risk assessment of system
- Have A2L fire extinguisher ready
- Put warning sign to notify work in progress, especially where refrigerant might be released
- Power off compressor / system
- Ventilation on
- a. Install extra fan
- Go in with gas detector / check regularly with gas detector or machinery room detector
- Close compressor shut off valves
- Release pressure
- a. Small gaseous amount to marked outside area
- Oil heater on
- Evacuate compressor
- a. Release vacuum pump outlet to marked outside area
- Charge compressor with Nitrogen
- Remove compressor
- a. Leave valves on pipes
- b. Check valves for tightness with leak detector
- c. Close compressor connections pressure tight with flanges or valves
- d. Evacuate removed compressor
- e. Put nitrogen holding charge in removed compressor
- Put sticker for flammable gas on return compressor
- Install replacement compressor
- Evacuate replacement compressor
- Open compressor shut off valves
- Remove warning signs
- Take compressor into operation again